Indore | 5 - 10 Years of Experience
Roles & Responsibilties :
"1. Carry out Scheduled Preventive Maintenance for maximum uptime 2. Plan for all spares and consumables to ensure there is no delay due to unavailibility of spares 3. Carry out break down maintenance within stipulated time frame 4. Carry out conditional based monitoring and predictive maintenance 5. Take parameter back up as and when neccessary 6. Faulty Items repair "
Job Function
Engineering Services Line
Age
28 - 35 Years
Experience
5 - 10 Years
Qualification
B.Tech/B.E., Diploma in Engineering.
Qualification - Experience Matrix
Qualification
Experience From
Experience To
Diploma in Engineering
6
12
B.Tech/B.E.
5
10
Key Skills
Ensuring Plant Uptime
(Area Assigned)
(Area Assigned)
1. Carry out Scheduled Preventive Maintenance for maximum uptime
2. Plan for all spares and consumables to ensure there is no delay due to unavailibility of spares
3. Carry out break down maintenance within stipulated time frame
4. Carry out conditional based monitoring and predictive maintenance
5. Take parameter back up as and when neccessary
6. Faulty Items repair
2. Plan for all spares and consumables to ensure there is no delay due to unavailibility of spares
3. Carry out break down maintenance within stipulated time frame
4. Carry out conditional based monitoring and predictive maintenance
5. Take parameter back up as and when neccessary
6. Faulty Items repair
A. %/Number of plant equipment’s Preventive maintenance done ( Planned Vs Actual)
B. Things should be done keeping in mind R&M budget of the plant
C. MTBF & MTTR
D.Assigned task completion on time
B. Things should be done keeping in mind R&M budget of the plant
C. MTBF & MTTR
D.Assigned task completion on time
Reduce Downtime
1. Carry out analysis for all problems or break downs for taking corrective actions
A. Downtime/month
B. Root cause analysis for individual break-down
B. Root cause analysis for individual break-down
Product Quality
1. Carry out CSD (CRITICAL SAFETY DEVICE) checking as per schedule
A. Number of CSD checking done ( Planned Vs Actual)
Reduction in loss of energy/ Machine efficiency improvement plan
1. Carry out energy saving/ machine efficiency improvement projects/ kaizens
A. Number of energy saving projects done
B. Number of units saved
C. % of Machine Uptime
B. Number of units saved
C. % of Machine Uptime
MIS
1. Complete Daily reports and Monthly MIS
A. Number of reports generated
Safety of employees
1. Ensure Safety of the employees, product and machines in their respective shifts
A. Number of safety incidents
TQM
1: kaizens
2: Improvement in 5 S score
3: Abnormality capturing
4. Active participation in TIE activities
2: Improvement in 5 S score
3: Abnormality capturing
4. Active participation in TIE activities
A:No of approved Kaizens
B: TIE audit score
B: TIE audit score
Self / Team Development
1: Training Plan for self and team
A. compliance with Training plan and its effectiness
Background
Posted On
04th April 2023