Location : dombivali
Min 3 yearsAssembly of Injection Mould (Cold Runner / Hot Runner) as per given standards, with in stipulated time frame.Assembly Press Tool (Stage / Pregressive) as per given drawings and with in stipulated time frameResponsible for the activites to prove the Tools Gathering inspection reports of all parts and prepare check list for Assembly. Attending trail of moulds and press tools and preparing trail report Analysis of the trail and preparing CAPA for next step (with help of tool engineer) On machine trouble shootingSkills: Capa, stage, Assembly
Experience: 3.00-5.00 Years